The Inside of the house has all been painted!


Outside of the house is prepped to have stucco, stone, etc. put on.


Tile placed in the mud/laundry room.


Tiled placed in the entry way. Also the front door was stained to a darker wood color.


Stair railing was put in and stained.


All the doors in the house have been put in.


Tile placed in the master bathroom.


Tile placed in the upstairs bathroom.


This is just to show the colors of the house. 

The interior of the house is getting close to being done!

Tuesday, June 21, 2011

June 21, 2011




 Tile is ready to be placed in the master bath.


Tile is ready to be placed in the upstairs bathroom.


Tile is ready to be placed in the entry way.


Fake wood floor has been placed in the dining/kitchen areas.


Tile is ready to be placed in the mud room/garage entry.


All the walls have been mudded and sanded.


They have all the doors, base boards, etc. in the garage ready to be put in.

Friday, June 10, 2011

June 10, 2011

Today we went by the house and found that the shingles had been put on the roof and that all the sheetrock had been placed inside the house. Now you can see how each room is going to look. Everything is starting to come together!


Roof with shingles now.


Garage.


Laundry room.


Kitchen/Dining room.


Pantry.


Living room. (Ashton was running all over the house and smiling the whole time. He really loves all the space!)


Entry.


Hall and stairs.


First bedroom.


Closet to the first bedroom.


Ashton's room.


Ashton's closet.


Bathroom.


Master bedroom.


Master bathroom.


Walk in closet.


They also got the basement all insulated!

Monday, June 6, 2011

June 5, 2011

Once again, we have lots of updates from just 1 week.


The roof is now ready for shingles.


Door to the garage door put in.


Plumbing and electric wiring put in.


Sliding glass door in the dining room.


Bath/shower.


Master bath and shower.


Heating/AC put in.


More of the plumbing.


Front door put in and entry has been cemented.


Windows are all put in.


Back wall was finished.

Seems like everyday they have soo much done. We went by the house twice this week and each time there was a lot of changes. Really is moving along.

Sunday, May 29, 2011

When we went by the house last week there hadn't been anything new done to it, which we figured was because of all the rain. So, with there being a bit of rain this week, we figured there prolly wouldn't be much done once again. However, we were wrong... there was quite a bit done to the house since last week!


Here is the front of the house


Front of the house where the front yard will be.


This is the entry way to the house.


This is looking into the garage from inside the house.


The laundry room.


Coat closet by the garage.


This is the kitchen and dining area.


The living room.


Coat closet by the entry way.


Hallway leading to the bedrooms and to the stairs to go to the basement.


One of the upstairs bedrooms.


The other upstairs bedroom.


Bathroom for the upstairs.


Master bedroom.


This is looking at the master bathroom and walk in closet.


This is the walk in closet to the master bedroom.


Master bathroom from inside the closet.


Stairs going down to the basement.


Family room.


This is where the bathroom and one of the rooms will be when we finish the basement.


2 more rooms will be in this space.


Back of the house.


Another picture of the back.


Inside the garage.


These next pictures are of the park that we found that is really close to our house. It's huge, and will be somewhere we can do a ton with family and friends.







Fire pit


I was way excited to see a full soccer field!


So ya, they are moving along on the house really fast. We are getting really excited with it all. Should be plenty to post in the upcoming weeks!